NORIKERAll demos
FINBLADE IN ACTION · 1:36

A full revision audit from one question

The agent checks every work instruction against every engineering change and lists the equipment running outdated procedures.

Manufacturing

FinBlade AI · Produced by ICS Nett · Sample data

See this with your own data
THE PROBLEM

Where work gets stuck.

Production runs on documented work instructions. When an engineering change lands, every instruction it touches has to follow. In practice some do not, and the gap shows up in an audit or after an incident.

THE RESULT

A clearer next step.

The demo ends with a specific list: which stations, which instruction, which change notice, and which date. A revision audit that took days becomes a question anyone on the floor can ask.

IN THE DEMO

What you’ll see.

01

Ask what the floor would ask

Which equipment has outdated work instructions?

02

The agent reads the whole set

Fourteen files: operating procedures, work instructions, engineering change notices, and the revision control policy.

03

Every revision is checked

The agent finds machines running superseded startup instructions and a safety-critical press whose instruction predates a control change.

04

The report goes out

The analysis becomes a formatted report and reaches the people who must act on it.

Read the full narration

Production runs on documented work instructions. When an engineering change lands, every instruction it touches has to follow it. This is the Production Knowledge and SOP Assistant. 4 nodes behind a single question. The question is the kind anyone on the floor would ask. Which equipment has outdated work instructions? The SuperAgent reads the whole document set, 14 files: standard operating procedures, work instructions, engineering change notices, and the revision control policy. It checks every revision against every change notice. 3 CNC machines are still running superseded startup instructions. Their work instructions cite SOP-025, revision 2. Revision 3 was required by the 15th of September. A hydraulic press is safety-critical. Its instruction predates the change from 2-hand controls to a light curtain. 7 more stations are overdue, each tied to a named change notice and a date. The analysis is written straight into a formatted report. Filename, font, margins, and page breaks are all set in the node, and the report goes to the people who have to act on it. One question, 14 documents. A full revision audit in minutes.

Company names, people, and figures in these demos are illustrative. Your configuration, data access, and deployment are defined during scoping.

Bring your own business question.

See this with your own data